0.909
Miles
14
Walls
19,940
Sq Ft MSE Walls
The Lexington Road project is a 3-year project that started in April 2021 and consists of 0.909 miles of widening and reconstruction on SR 10 Loop at Lexington Road. This multi-stage project involves over 550 linear feet of engineered soil nail walls installed underneath the existing SR 10 Loop Bridge and will involve counterflowing traffic. There is an additional 622 linear feet of engineered soil nail wall parallel to the SR 10 Loop to allow the construction of a new ramp from Lexington Road. The project also includes over 19,900 square feet of MSE Walls.